Commencement notice group
Building extension commencement notices — Carlow
Carlow, Carlow
1 separate notice · latest notified commencement 23 Sep 2019 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 23 Sep 2019
- Latest notice
- 101 m²
- Planning references supplied
- 1928
- Public location
- Carlow, Carlow
Public source geography
Site location
- Public site / locality
- Carlow, Carlow
- County
- Carlow
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Carlow County Council · reference 1928 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
the erection of a single storey extension incorporating 1 No. mainstream classroom and new main entrance lobby (total floor area of proposed extension = 101.4msq) to the front of existing single storey school building, realignment / setting back of part of the existing roadside boundary wall to provide a bus set down area, provision of a second vehicular access in order to provide a one way traffic policy, provision of 5 No. additional car parking spaces, together with all associated site works
101 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.