Site start

Housing site start — Blackrock

Blackrock, Dublin

1 commencement notice · start date 10 Apr 2024 · planning reference given

Planning D23A/0538 · Planning application

View full project timeline

Commencement notices
1
Latest start date
10 Apr 2024
Latest notice
4 houses
Planning reference
D23A/0538
Location
Blackrock, Dublin

Location

Where the site is

Area
Blackrock, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

"Belclare" Development will consist of: 1. Partial demolition of existing front wall to create new vehicular access to the site from Newtownpark Avenue. 2. New driveway to access proposed new properties. 3. Construction of 4 no. detached dwelling houses, flat roof four bedroom units. 4. Eight on curtilage car parking spaces(2 each) and private amenity open space to each new dwelling. 5. Existing vehicular entrance gateway (a Protected Structure) to remain as the vehicular entrance to the existing house Belclare. 7. New landscaping, tree planting and boundary treatments. 8. SuDS surface water drainage, foul water potable water connections. 9. All ancillary works necessary to facilitate the development.

Work stated for this notice 4 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 777 m².

Planning reference D23A/0538

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.