Site start
Housing site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 08 Dec 2015 · planning reference given
Planning D14A/0645 · Planning application
- Commencement notices
- 1
- Latest start date
- 08 Dec 2015
- Latest notice
- 1 house
- Planning reference
- D14A/0645
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
House extension and refurbishment works at no.57 Carysfort Avenue consisting of: a. The re-roofing of the main house. b. The refurbishment of the house, including internal partition revisions, new structural opes, new bathrooms, utility room, window refurbishment, new traditional windows, replacement stairs and all associated works. c. The complete refurbishment of the existing rear return, including the removal of non original in-fill bathroom, provision of a new rooflight, fenestration revisions, structural opes, new floors, insulation, cladding and all associated works. d. The provision of a new two-storey extension to the rear of the property, associated structural ope, along external staircase and all site works. e. The widening of the existing vehicular access gates from Carysfort Avenue to 3.2 m.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.