Site start
Housing site start — Bantry
Bantry, Cork
1 commencement notice · start date 16 Aug 2016 · planning reference given
Planning 16/224 · Planning application
- Commencement notices
- 1
- Latest start date
- 16 Aug 2016
- Latest notice
- 1 house
- Planning reference
- 16/00224
- Location
- Bantry, Cork
Location
Where the site is
- Area
- Bantry, Cork
- County
- Cork
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alteration, renovation and extension of existing dwelling house named "Cuan Slan". The requested permission includes the following (a) permission to demolish the existing glazed sun room located to the west of the dwelling house (b) permission to alter the existing elevations (c) permission to carry out internal modifications to both ground and first floor levels of the existing layout (d) permission to demolish the existing pitched roof located to the east of the dwelling (e) permission to increase the existing roof pitch located to west of the dwelling to accommodate for (f) the relocation of an existing first floor bedroom and (g) to accommodate for the creation of new living space to the first floor level (h) and permission to carry out all ancillary site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.