Commencement notice group
Housing commencement notices — Bandon
Bandon, Cork
2 separate notices · latest notified commencement 01 Oct 2024 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 01 Oct 2024
- Latest notice
- 43 units
- Planning references supplied
- 21/4711
- Public location
- Bandon, Cork
Public source geography
Site location
- Public site / locality
- Bandon, Cork
- County
- Cork
Public site labels seen across the notices
- ground floor level and 5 no
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Application details, the decision and any documents published by the authority are available in the official planning file.
-
Official planning file Application details, decision and available documents Cork County Council · reference 21/4711 Official council planning portal checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
P�irc an Mhuilinn, Distillery Road, Bandon, Cork: The demolition of an existing house and garage and the construction of 43 no. units which comprises of 5 no. Blocks. Block A consists of 5 no. units apartments at ground floor level and 5 no. duplex's at first floor level (nos 1-10). Block B consists of 5 no. units apartments at ground floor level and 5 no. duplex's at first floor level (nos 11-20). Block C consists of 4 no. units apartments at ground floor level and 4 no. duplex's at first floor level (nos 21-28). Block D consists of 4 no. units apartments at ground floor level and 4 no. duplex's at first floor level (nos 29-36). Block E consists of 4 no. units apartments at ground floor level and 3 no. duplex's at first floor level (nos 37-43) and all ancillary works.
43 units · 2,546 m² · stated on this notice
Páirc an Mhuilinn, Distillery Road, Bandon, Cork: The demolition of an existing house and garage and the construction of 43 no. units which comprises of 5 no. Blocks. Block A consists of 5 no. units apartments at ground floor level and 5 no. duplex's at first floor level (nos 1-10). Block B consists of 5 no. units apartments at ground floor level and 5 no. duplex's at first floor level (nos 11-20). Block C consists of 4 no. units apartments at ground floor level and 4 no. duplex's at first floor level (nos 21-28). Block D consists of 4 no. units apartments at ground floor level and 4 no. duplex's at first floor level (nos 29-36). Block E consists of 4 no. units apartments at ground floor level and 3 no. duplex's at first floor level (nos 37-43) and all ancillary works.
43 units · 1,876 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.