Site start
Housing site start — Blackrock
Blackrock, Louth
3 commencement notices · latest start date 27 Feb 2017 · planning reference given
Planning 14450 · Council file · external
- Commencement notices
- 3
- Latest start date
- 27 Feb 2017
- Latest notice
- 5 houses
- Planning reference
- 14450
- Location
- Blackrock, Louth
Location
Where the site is
- Area
- Blackrock, Louth
- County
- Louth
Addresses on the notices
- Cnoc na Mara, Golf Links Road, Blackrock, Co
- Dundalk, Louth
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 3 No. detached houses, house type A No.14, 15 & 16 Seaview Drive and 2 No. semi-detached houses, house type B No.s 17 & 18 Seaview Drive, at Cnoc na Mara, Golf Links Road, Blackrock, Co. Louth.
Construction of 8 No. detached houses, No.1,10,11,12,13,113,114 and 115 Blackrock Cove(House Types A and D).
Construction of 8no. Housing units. No.2 to No.9 Blackrock Cove, consisting of 6no. Type A detached houses and 2no. Type B semi detached houses, including boundary treatment and associated site development works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.