Site start
Housing site start — Dublin
Dublin 6, Dublin
2 commencement notices · latest start date 20 Jan 2023 · planning reference given
Planning 2154/19 · Planning application
- Commencement notices
- 2
- Latest start date
- 20 Jan 2023
- Latest notice
- 320 m²
- Planning reference
- 2154/19
- Location
- Dublin 6, Dublin
Location
Where the site is
- Area
- Dublin 6, Dublin
- County
- Dublin
Addresses on the notices
- rear of main house at 201A Harold's Cross Road, Dublin 6
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
2 no. 3-storey blocks with 5 No. apartments at rear of main house at 201A Harold's Cross Road, Dublin 6
Floor area stated for this source: 320 m².
Source unit value with scope not stated: 5 units. It is not presented as notice-specific scale.
Refurbishment and extensions to existing building (Protected Structure, RPS Ref. No. 3584), alterations to floor layouts to provide 7 no. apartments, 2-storey rear extensions and change of use from retail use to residential at 199/201 Harold's Cross Road, Dublin 6
Floor area stated for this source: 490 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.