Site start

Site start — Killinaboy

Killinaboy, Clare

1 commencement notice · start date 11 Nov 2022 · planning references given

Planning 14/293 19/501 · Council file · external

Commencement notices
1
Latest start date
11 Nov 2022
Latest notice
224 m²
Planning references
14/293 · 19/501
Location
Killinaboy, Clare

Location

Where the site is

Area
Killinaboy, Clare
County
Clare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

dwellinghouse, wastewater treatment system and percolation area together with ancillary site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 224 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference 14/293 Planning reference 19/501

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.