Commencement notice group
Building extension commencement notices — Newbridge
Newbridge, Kildare
1 unique commencement event · latest notified commencement 29 Aug 2017 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 29 Aug 2017
- Latest notice
- 1 unit
- Planning references supplied
- None stated
- Public location
- Newbridge, Kildare
Public source geography
Site location
- Public site / locality
- Newbridge, Kildare
- County
- Kildare
No usable public source coordinate is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
(a) Demolition of rear extension to existing cottage (b) Demolition of existing sheds to the rear of the existing cottage (c) The construction of a new single storey domestic extension to the rear of the existing cottage (d) Modifications to the existing cottage (e) The provision of a new wastewater treatment plant and percolation area to replace the existing septic tank (f) The closing up of the existing vehicular site entrance and the construction of a new recessed site entrance (g) New timber post and rail fence and indigenous hedgerow boundary to the north east and (h) all associated site development works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.