Site start

Housing site start — Killiney

Killiney, Dublin

2 commencement notices · latest start date 25 May 2026 · planning reference given

Planning D24A/0635/WEB · Planning application

View full project timeline

Commencement notices
2
Latest start date
25 May 2026
Latest notice
1 unit
Planning reference
D24A/0635/WEB
Location
Killiney, Dublin

Location

Where the site is

Area
Killiney, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Construction of new 3-storey block of 6 apartments and all associated site works

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 507 m².

Planning reference D24A/0635/WEB Developer stated: Brinnin Holdings Limited
Notice 2 Seven-day notice

(a) demolition of existing derelict structures on site, (b) replacement with the construction of 4 no. new 1 bed apartments in 1no. two storey block, with associatd. carparking spaces, (c) provision of bin storage area and construction of single storey bike storage, (d) relocation and widening of existing vehicular entrance including the construction of a new stone wall and piers and internal access road all in accordance with DMURS, (e) alterations and repairs to existing front boundary wall including new metal railing atop existing wall with mature planting inside, (f) construction of new masonry boundary wall to west side in place of existing panel fence, (g) new connections to all public utilities including water, wastewater, gas, electrical and telecoms, (h) provision of surface water attenuation and disposal in accordance with SuDS, (i) new hard and soft landscaping including planting of mature trees and (j) all ancillary site development works required.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 239 m².

Planning reference D24A/0635/WEB Developer stated: Brinnin Holdings Limited

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.