Site start

Commercial site start — Corballis

Corballis, Swords, Co. Dublin., Dublin

3 commencement notices · latest start date 11 Sep 2017 · planning reference given

Planning F16A/0155 · Planning application

View full project timeline

Commencement notices
3
Latest start date
11 Sep 2017
Latest notice
Scale not stated
Planning reference
F16A/0155
Location
Corballis, Swords, Co. Dublin., Dublin

Location

Where the site is

Area
Corballis, Swords, Co. Dublin., Dublin
County
Dublin

Addresses on the notices

  • Corballis, Swords, Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The development will consist of the construction of a new 6 storey office building (Building A6 FSC/359/17), associated centralised landscaped courtyard and landscape park, ancillary bin store/plant room structure (Building A10a FSC/360/17,), ESB Substation (Building A8) and all other ancillary site development works.

Work stated for this notice Scale not stated for this notice.
Planning reference F16A/0155
Notice 2 Commencement notice

The development will consist of the construction of a new 6 storey office building (Building A1 FSC347/17), associated centralised landscaped courtyard and landscape park, ancillary bin store/plant room structure (Building A10b FSC/361/17), and all other ancillary site development works.

Work stated for this notice Scale not stated for this notice.
Planning reference F16A/0155
Notice 3 Commencement notice

The development will consist of the construction of a raised pedestrian link bridge from the central courtyard to connect to Level 3 of the existing Terminal 2 (T2) multi-storey car park building (Building A9), and all other ancillary site development works.

Work stated for this notice Scale not stated for this notice.
Planning reference F16A/0155

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.