Commencement notice group
Commencement notices — Drogheda
Drogheda, Louth
6 unique commencement events · latest notified commencement 24 Apr 2025 · planning reference supplied
- Unique commencement events
- 6
- Latest notified commencement
- 24 Apr 2025
- Latest notice
- 29 m²
- Planning references supplied
- 22/602
- Public location
- Drogheda, Louth
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 22/602 Louth County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Drogheda, Louth
- County
- Louth
Notice location variants
- Drogheda MacBride Railway Station
- Notice source points are up to 320 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.712073, -6.335537 Open point
- Public notice source · 53.712073, -6.335537 Open point
- Public notice source · 53.712073, -6.335537 Open point
- Public notice source · 53.712073, -6.335537 Open point
- Public notice source · 53.712076, -6.335539 Open point
- Public notice source · 53.714688, -6.337578 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Louth County Council planning record Application details, status and decision record for 22/602. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Installation of a battery charging facilities for battery electric trains. Building XC5 is a pre-fabricated modular unit containing energy storage and control equipment.
Floor area stated for this source: 29 m².
Installation of a battery charging facilities for battery electric trains. Building XC4 is a pre-fabricated modular unit containing energy storage and control equipment.
Floor area stated for this source: 29 m².
Installation of a battery charging facilities for battery electric trains. Building XC3 is a pre-fabricated modular unit containing energy storage and control equipment.
Floor area stated for this source: 56 m².
Installation of a battery charging facilities for battery electric trains. Building XC2 is a pre-fabricated modular unit containing energy storage and control equipment.
Floor area stated for this source: 56 m².
Installation of a battery charging facilities for battery electric trains. Building XC1 is a pre-fabricated modular unit containing energy storage and control equipment.
Floor area stated for this source: 31 m².
Permission for the development of electrical charging infrastructure for its Battery Electrical Multiple Units (BEMU) fleet at Drogheda MacBride Railway Station. Comprising of the construction of a modular 10kv ESB/traction substation in the lower car park of the railway station, overhead line charging facilities at 2 no. platforms and 1 no. depot track and electrical cables in ducts form the substation to the charging facilities, together with all necessary ancillary works. The proposed works
Floor area stated for this source: 47 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.