Site start
Commercial site start — Dublin
Dublin 1, Dublin
1 commencement notice · start date 22 Apr 2019 · planning reference given
Planning 4750/18
- Commencement notices
- 1
- Latest start date
- 22 Apr 2019
- Latest notice
- 2,638 m²
- Planning reference
- 4750/18
- Location
- Dublin 1, Dublin
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
Addresses on the notices
- fifth floor level fronting onto Bolton Street and to north and south elevations
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a 4 to 6 storey over basement 66 bedroom hotel of approx. 2,638 sq.m with balconies facing onto Bolton Street (from second to fourth floor levels), as well as a set backed terrace (non-public access) at fifth floor level fronting onto Bolton Street and to north and south elevations; all ancillary hotel areas to include foyer reception, bar, dining area, 12 no. cycle spaces at ground floor level, hotel bedrooms from first to fifth floor levels as well as ESB sub-station at ground level onto Bolton Street; lighting, roof plant areas; ancillary basement areas to include storage/ plant/ services/ staff areas; canopy to entrance onto Bolton Street and all ancillary site development/ boundary works.
Floor area stated for this source: 2,638 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.