Site start
Building extension site start — Terenure
Terenure, Dublin
1 commencement notice · start date 11 Jun 2015 · planning reference given
Planning WEB1352/14
- Commencement notices
- 1
- Latest start date
- 11 Jun 2015
- Latest notice
- Scale not stated
- Planning reference
- WEB1352/14
- Location
- Terenure, Dublin
Location
Where the site is
- Area
- Terenure, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alterations and Extensions to existing semi-detached single storey dormer bungalow with accommodation within roofspace comprising a) Demolition of existing single storey Sunroom to rear and substandard covered canopy to side passage, b) Construction of a new single storey extension to rear which encompasses the provision of additional habitable accommodation within the extended roof space, and enclosing existing covered porch entrance which all result in an increase in habitable floor area from 149.7 sq.m. to 216.6 sq.m., c) Amendments to the floor levels within the existing and extended dwelling, d) Consequential Internal and Elevational Alterations including provision of new dormers to rear (including balcony recessed into roof plane) and side, alterations to the existing dormers to the front, and,moving of front entrance door, e) Construction of new 5.5 sq.m. non-habitable storage area in existing side passage, and, f) All associated site & landscaping works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.