Site start
Site start — Dublin
Dublin 8, Dublin
1 commencement notice · start date 07 Dec 2022 · planning reference given
Planning 2354/17/X1
- Commencement notices
- 1
- Latest start date
- 07 Dec 2022
- Latest notice
- 834 m²
- Planning reference
- 2354/17
- Location
- Dublin 8, Dublin
Location
Where the site is
- Area
- Dublin 8, Dublin
- County
- Dublin
Addresses on the notices
- first floor
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new two storey 220kV GIS building and associated ground works. The building will contain a Gas Insulated Switchgear (GIS Switchgear room on the ground floor with a control room, a battery room and a room for future expansion at first floor. The first floor is accessed via two protected staircases. The building is for use by ESB Networks maintenance personnel. This building is an unmanned station building located within an unmanned electrical transmission station, which is remotely controlled from a centralised location via a System Control and Data Acquisition (SCADA) system via fibre link from a National Control Centre. This is a controlled environment with access restricted to authorised ESB Networks personnel only; the public will not have access. The station is unmanned during normal operations. Monthly periodic visits will be carried out by ESB Networks personnel for inspection purposes, including two maintenance personnel for two to three hour durations.
Floor area stated for this source: 834 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.