Commencement notice group
Building extension commencement notices — Carlow
Carlow, Carlow
1 unique commencement event · latest notified commencement 14 Nov 2019 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 14 Nov 2019
- Latest notice
- 1 unit
- Planning references supplied
- 18/190
- Public location
- Carlow, Carlow
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Carlow, Carlow
- County
- Carlow
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Carlow County Council planning record Application details, status and decision record for 18/190. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: A) The demolition of an original single storey structure with pitched roof to rear of existing property, Demolition of non-original single storey lean-to structure to the right and rear of existing property, demolition of non-original glazed structure to left and rear of existing property, deconstruction of original shed to rear and reuse of brick; B) Alterations to ground floor and first floor layout of existing structure including forming new structural openings and removal of partitions; C) Construction of new two storey extension to rear of property, construction of single storey extension to right and rear of existing structure, construction of new glazed structure to left and rear of existing; D) Removal of aluminium framed windows to front façade to be replaced with timber framed sliding sash windows; E) all associated ancillary landscaping and site works.
Floor area stated for this source: 261 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.