Commencement notice group
Building extension commencement notices — Newbridge
Newbridge, Kildare
1 separate notice · latest notified commencement 03 Dec 2020 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 03 Dec 2020
- Latest notice
- 11,718 m²
- Planning references supplied
- 17/328
- Public location
- Newbridge, Kildare
Public source geography
Site location
- Public site / locality
- Newbridge, Kildare
- County
- Kildare
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Kildare County Council · reference 17/328 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(a) 20 classroom temporary system buildings of part 1 and part 2 storeys, of 1,600sqm in area, to be removed on completion of the development. (b) the removal of existing single storey prefabricated structures of 992sqm on completion of the development. (c) the refurbishment and extension of the primary school will consist of:(a) new 2 storey building providing 9 no. classrooms and support spaces with floor area of 686sqm; (b) reconfiguration and refurbishment of 5 no. classrooms and associated support spaces in existing school building. (d) the refurbishment and extension of the infant school will consist of: (a) new 2 storey building providing 9 no. classrooms and support spaces with floor area of 531sqm; (b) new double height general purpose hall and support spaces with a floor area of 272sqm; (c) reconfiguration and refurbishment of 7 no. classrooms and associated spaces in existing school building (e) new special needs unit 1 storey extension, providing 3 no. special needs unit classrooms and associated spaces with a floor area of 649sqm and a new 1 storey link corridor, with a floor area of 47sqm. (f) external works will include 4 no. ballcourts 2,340sqm, 2 no. junior play areas of 860sqm, a secure hard and soft play area of 200sqm, a sensory garden of 100sqm, a total of 66 car park spaces, widening and associated works to the existing vehicular entrance, proposed new 7000mm wide opening in existing boundary wall to accommodate re-configured road/exit off main Naas Road R445 to the South/Eastern boundary of the site, new gates and associated site landscape works (g) Temporary construction/school entrance to the South/Eastern corner boundary of the site formed off main Naas Road R445 for the duration of the construction period. Reinstatement of the existing boundary wall once works are complete (h) All associated and ancillary site works on an overall site area of 1.95 hectares
11,718 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.