Site start

Site start — Malahide

Malahide, Dublin

1 commencement notice · start date 22 Feb 2019 · planning reference given

Planning F18A/0173 · Planning application

View full project timeline

Commencement notices
1
Latest start date
22 Feb 2019
Latest notice
89 m²
Planning reference
F18A/0173
Location
Malahide, Dublin

Location

Where the site is

Area
Malahide, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

1) Demolition of existing cottage. 2) Construct new 2 bedroom cottage. 3) Reduction of ground and site levels to rear of cottage with new retaining walls, fencing, access staircase and patio area. 4) New connections to foul and surface drainage to existing foul and surface water sewers and all ancillary site and associated works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 89 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference F18A/0173

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.