Building extension site start — Ranelagh
Ranelagh, Dublin
1 commencement notice · start date 07 Sep 2015 · planning reference given
Planning 2491/15
- Commencement notices
- 1
- Latest start date
- 07 Sep 2015
- Latest notice
- Scale not stated
- Planning reference
- 2491/15
- Location
- Ranelagh, Dublin
Location
Where the site is
- Area
- Ranelagh, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed development is comprised of the demolition of the rear sheds, partial demolition of the ground floor return wall, the repositioning of the return first floor, internal remodeling, and internal insulation, the replacement of the windows and front door, and the installation of solar collectors to the existing roof. Proposed construction includes new front boundary railings on a plinth with a gate to enclosed two car parking spaces, and also a ground floor extension to the rear. Associated works will include external services, drainage and landscaping as required to meet both the requirements of the Local Authority and the implicit requirements of the development described in this proposed planning application.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.