Site start

Housing site start — Lixnaw

Lixnaw, Kerry

1 commencement notice · start date 21 Sep 2026 · planning reference given

Planning 23/269 · Council file · external

Commencement notices
1
Latest start date
21 Sep 2026
Latest notice
60 houses
Planning reference
23/269
Location
Lixnaw, Kerry

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Lixnaw, Kerry
County
Kerry

Addresses on the notices

  • ground level and 2 no
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kerry County Council planning record Application details, status and decision record for 23/269. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The construction of 60 no. new residential units overall, which consist of 28 no. semi-detached 3 bedroom two storey houses, 2 no. semi detached 3 bedroom two storey houses, 15 no. terraced 1 bedroom single storey houses, 3 no. detached 4 bedroom two storey houses, 3 no. three storey duplex buildings each containing 2 no. 2 bedroom residential units at ground level and 2 no. 2 bedroom residential units over 2 storeys at 1st and 2nd floor level in each building.

Work stated for this notice 60 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 7,564 m².

Planning reference 23/269 Developer stated: dcmanor ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.