Site start

Capincur Industrial Estate — site start

Tullamore, Offaly

1 commencement notice · start date 08 Jun 2021 · planning reference given

Planning 19219 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
08 Jun 2021
Latest notice
1,540 m²
Planning reference
19219
Location
Tullamore, Offaly

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate recorded — source scope not stated Offaly County Council · commencement notice Completion certificate · First observed in the official monthly source 2021-06 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Tullamore, Offaly
County
Offaly

Addresses on the notices

  • Capincur Industrial Estate, Daingean Road, Tullamore, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Offaly County Council planning record Application details, status and decision record for 19219. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The Demolition of 3 No. existing buildings (covers to yards D4-L, D4 and D4-R_ and the extension of existing D-WEEE Building to cover existing open yard and footprint of the 3 existing buildings being demolished, and associated site works. Floor Area of buildings to be demolished = 995sq.m, floor area of proposed extension = 1,540sq.m, max height = 11.1m. The facility operates under Waste Licence No. W0113-01 and Industrial Emissions Licence (Main Class of Activity 11.2(F)) at Capincur Industrial Estate, Daingean Road, Tullamore, Co. Offaly.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,540 m².

Planning reference 19219

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.