Site start

Site start — Dun Laoghaire

Dun Laoghaire, Dublin

1 commencement notice · start date 16 Oct 2024 · planning reference given

Planning D24A/0130 · Planning application

Commencement notices
1
1 repeat copy merged
Latest start date
16 Oct 2024
Latest notice
1 unit
Planning reference
D24A/0130
Location
Dun Laoghaire, Dublin

Commencement and completion records

Planning, start and completion

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Planning applications
Links to official records
0
Links between applications
Repeat copies merged
Completion certificates

Location

Where the site is

Area
Dun Laoghaire, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 1 duplicate source representation is consolidated under the canonical notice reference while every source remains visible beneath that event.

Notice 1 2 public source representations

Reconstruction of the existing 17-degree pitched and hipped roofs comprising a new 33-degee pitch to the roof, to align with neighbouring roof at 11 Sydenham Mews, with new rooflights in position of existing rooflights at front and rear. New gable wall to north elevation, with french door with metal guardrail to attic level facing north and new pedestrian gate serving rear yard of mews

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 144 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference D24A/0130
Source representations
  • Commencement notice Notified commencement: 2024-10-16 Source checked: 2026-06-09T15:11:14Z Phase quantity stated in this source representation: 1 unitFloor area stated in this source representation: 144 m² Open source record
  • Historical commencement notice Notified commencement: 2024-10-16 Source checked: 2026-10-30T03:12:07Z Source unit value stated in this representation: 1 unitFloor area stated in this source representation: 144 m² Open source record

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.