Site start
Site start — Clondalkin
Clondalkin, Dublin
2 commencement notices · latest start date 20 Mar 2025 · planning reference given
Planning ABP-312793-22
- Commencement notices
- 2
- Latest start date
- 20 Mar 2025
- Latest notice
- 102 m²
- Planning reference
- ABP-312793-22
- Location
- Profile Park, Clondalkin, Dublin
Location
Where the site is
- Area
- Clondalkin, Dublin
- County
- Dublin
Addresses on the notices
- Profile Park, Clondalkin, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-312793-22. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed development allows for the transmission of power from the electrical grid to the adjacent data centres. This commencement notice relates to 4 no. single storey prefabricated buildings which are within the GIS compound. These include three MV switch rooms, each 17 sqm in area, which contain ancillary equipment for the transformers and a Client Control Building which is 51.5 sqm in area.
Floor area stated for this source: 102 m².
The proposed two storey structure is to contain Gas Insulated Switchgear for the transmission of power from the electrical grid to the adjacent data centres. The building contains a switchgear and store room at first floor level, a cable pit for running of cables to first floor level, a control room, battery room, ancillary accommodation and a generator room. Following the completion of the building it will be handed over to the utility provider, Eirgrid.
Floor area stated for this source: 1,525 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.