Commencement notice group
Housing commencement notices — Ranelagh
Ranelagh, Dublin
1 unique commencement event · latest notified commencement 27 May 2015 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 27 May 2015
- Latest notice
- Scale not stated
- Planning references supplied
- None stated
- Public location
- Ranelagh, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Ranelagh, Dublin
- County
- Dublin
Notice location variants
- rear of all ground-floor windows to main house and return, plus block up one window, plus lower 3no CN0007279DC
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Development to consist of removal of existing rear-garden shed plus partial demolition of existing single-storey extension plus demolition of 2-storey rear-return gable complete including fireplaces x 2 no, chimney-breasts, and pots, plus removal at rear of all ground-floor windows to main house and return, plus block up one window, plus lower 3no. window cills to make 2 new doorways connecting with new landscaped and paved winter-garden and bicycle store plus provide new two-storey extension with new gable in salvaged brick to match existing with lower storey glazed with extruded return as per roof profile to provide extended bedroom at first floor plus provide new flat roof with roof-light and sedum planting over new extended kitchen dining with new living plus adjustments to existing rainwater goods, plus new en-suite bathroom at first floor plus new solar panels on main roof facing Oxford Road, plus new dormer-window to attic-store on rear pitch of main house plus adjustments to landscaping of rear garden plus replace 2 no. roof lights in rear-return pitch roof plus all associated works
Overall development total stated in source: 1 house.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.