Site start
Housing site start — Dublin
Dublin 4, Dublin
2 commencement notices · latest start date 10 Dec 2019 · planning reference given
Planning 2072/17
- Commencement notices
- 2
- Latest start date
- 10 Dec 2019
- Latest notice
- Scale not stated
- Planning reference
- 2072/17
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
Addresses on the notices
- ground level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a basement level and extension to the side and rear at ground level. Alterations and works to the existing property that will connect to the new ground floor and basement extension. Construction of an ancillary single storey one bedroom guest accommodation unit to the rear of the site, connected at basement level. Overall works include refurbishment and repair of the main house, boundary walls, drainage, site services and landscape.
Enabling Works including (1) Demolition of the existing single storey ground floor extension to side and rear, single storey out-building, flagpoles and surface car park to rear; (2) Underpinning the structure and installing mini piles and ground beams; (3) Construction of a secant pile wall, temporary propping and monitoring systems; (4) Construction of a King post wall to enable construction of the staff flat to the rear and (5) Excavation of Soil & Removal from site all to enable construction of the permanent basement structures, in the subsequent phase.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.