Site start
Building extension site start — Clonee
Clonee, Dublin
1 commencement notice · start date 28 Sep 2020 · planning reference given
Planning FW20B/0008 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 Sep 2020
- Latest notice
- 1 unit
- Planning reference
- FW20B/0008
- Location
- Clonee, Dublin
Location
Where the site is
- Area
- Clonee, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of building up the existing gable wall to create an Apex gable end to match the existing ridge line. This will facilitate the conversion of the existing internal attic space to a study and storage space including proposed roof lights to the rear and small window on the new gable and all associated site development works.
Floor area stated for this source: 27 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.