Commencement notice group

Housing commencement notices — Naas

Naas, Kildare

1 unique commencement event · latest notified commencement 21 Dec 2023 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
21 Dec 2023
Latest notice
599 m²
Planning references supplied
23/579
Public location
Naas, Kildare

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Naas, Kildare
County
Kildare

Notice location variants

  • rear, including security gates and 2 No signs (front and rear) CN0108350KE
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 23/579. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0108350KE BCMS open-data feed

Demolition of temporary access to Bank of Ireland in former part of Bank of Ireland structure, including ramp and rail and removal of ATM machine. Modification of former Bank of Ireland Structure to create a new opening to a new plaza at rear, including security gates and 2 No signs (front and rear). Provision of new public house internal layout for the Forge Inn over 4 No floors including basement, along with minor works to north facade and provision of 3 storey lift lobby extension. Provision of retail use in existing vacant unit to the rear of the Forge Inn including new glazing. Provision of new plaza including hard and soft landscaping, seating and lighting. Erection of 2 No ATM machines on south fa cade of Bank of Ireland building and provision of new entrance doors and 3 no. signs. All associated site works including drainage, vacant retail unit to rear of the Forge Inn and vacant land to the rear of the former Bank of Ireland Building No 47 (protected Structure RPS Ref NS19-034) Bank of Ireland No 48 (protected Structure RPS Ref NS19-033) at South Main Street, Naas, Co Kildare

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 599 m².

Planning reference 23/579

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.