Commencement notice group
Housing commencement notices — Naas
Naas, Kildare
1 unique commencement event · latest notified commencement 21 Dec 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 21 Dec 2023
- Latest notice
- 599 m²
- Planning references supplied
- 23/579
- Public location
- Naas, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 23/579 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Naas, Kildare
- County
- Kildare
Notice location variants
- rear, including security gates and 2 No signs (front and rear) CN0108350KE
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 23/579. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of temporary access to Bank of Ireland in former part of Bank of Ireland structure, including ramp and rail and removal of ATM machine. Modification of former Bank of Ireland Structure to create a new opening to a new plaza at rear, including security gates and 2 No signs (front and rear). Provision of new public house internal layout for the Forge Inn over 4 No floors including basement, along with minor works to north facade and provision of 3 storey lift lobby extension. Provision of retail use in existing vacant unit to the rear of the Forge Inn including new glazing. Provision of new plaza including hard and soft landscaping, seating and lighting. Erection of 2 No ATM machines on south fa cade of Bank of Ireland building and provision of new entrance doors and 3 no. signs. All associated site works including drainage, vacant retail unit to rear of the Forge Inn and vacant land to the rear of the former Bank of Ireland Building No 47 (protected Structure RPS Ref NS19-034) Bank of Ireland No 48 (protected Structure RPS Ref NS19-033) at South Main Street, Naas, Co Kildare
Floor area stated for this source: 599 m².