Commencement notice group

Housing commencement notices — Dublin

Dublin, Dublin

1 separate notice · latest notified commencement 30 Oct 2025 · planning reference supplied

Source notices
1
Latest notified commencement
30 Oct 2025
Latest notice
2 homes
Planning references supplied
3069/24
Public location
Dublin, Dublin

Public source geography

Site location

Public site / locality
Dublin, Dublin
County
Dublin
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning reference3069/24

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0135041DC BCMS owner-supplied export

(a) Demolition of existing two-storey side extension and proposed ground floor single storey extension to rear along with ground and first floor reconfigurations and a dormer extension to rear (b) construction of a four bedroom two storey with attic accommodation and dormer extension to rear (c) new vehicular access entrance along Merlyn Road (d) garden studio and storage structures to the rear of both houses with all associated alterations, site works and ancillary works.

2 homes · 360 m² · stated on this notice

Planning reference 3069/24

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.