Commencement notice group

Housing commencement notices — Dromin

Dromin, Kilmallock, Limerick

1 unique commencement event · latest notified commencement 27 Mar 2024 · planning references supplied

Unique commencement events
1
Latest notified commencement
27 Mar 2024
Latest notice
1 house
Planning references supplied
201097 · 2360027
Public location
Dromin, Kilmallock, Limerick

Public source geography

Site location

Public site / locality
Dromin, Kilmallock, Limerick
County
Limerick

Public site labels seen across the notices

  • Ballinlee South, Dromin, Kilmallock, Co
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0111633LL BCMS owner-supplied export

New dwelling, entrance, septic tank at Ballinlee South, Dromin, Kilmallock, Co. Limerick

Work stated for this notice 1 house Explicit notice quantity stated by the source.

Floor area stated for this source: 231 m².

Planning reference 201097 Planning reference 2360027 Builder stated: MH Construction Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.