Commencement notice group
Housing commencement notices — Naas
Naas, Kildare
7 unique commencement events · latest notified commencement 21 Mar 2023 · planning reference supplied
- Unique commencement events
- 7
- Latest notified commencement
- 21 Mar 2023
- Latest notice
- 942 m²
- Planning references supplied
- ABP-305416-19
- Public location
- Naas, Kildare
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Naas, Kildare
- County
- Kildare
Notice location variants
- Kill, Kildare
- The Meadows, Kill, Co
- Newtown, Kill, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-305416-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Block C Residential Development, Kill, Co. Kildare, Construction of a three storey block of 10no. apartments comprising 4no. 2 bed own hall door apartments (ground floor) and 6no. 2 bed maisonettes own hall door apartment units (first and second floor).
Floor area stated for this source: 942 m².
Source unit value with scope not stated: 10 units. It is not presented as notice-specific scale.
Block B Residential Development, Kill, Co. Kildare, Construction of a three storey block of 11no. apartments comprising 4no. 1 bed own hall door apartments and 1no. 2 bed own hall door apartment (ground floor), 4no. 2 bed duplex own hall door apartment units (first and second floor), 1no. 2 bed own hall door apartment unit with shared lobby (first floor) and 1no. 2 bed own hall door apartment (second floor).
Floor area stated for this source: 938 m².
Construction of a two storey block of 4no. apartments numbers 25,26,27,28 Newtown Way.
Floor area stated for this source: 319 m².
Construction of a two storey block of 4no. apartments numbers 21,22,23,24 Newtown Way.
Floor area stated for this source: 319 m².
Residential Development at The Meadows, Kill, Co. Kildare. 75 Housing Units.
Floor area stated for this source: 8,334 m².
Construction of a three storey block of 15no. apartments comprising 6no. 1 bed own hall door apartments (ground floor), 6no. 2 bed duplex own hall door apartment units (first and second floor), 1no. 2 bed own hall door apartment unit with shared lobby (ground floor), 1no. 2 bed own hall door apartment unit with shared lobby (first floor) and 1no. 2 bed own hall door apartment (second floor) on site nos. 03,04,05,06,07 and 08 Newtown Way and 07,08,09,10,11,12,13,14 and 15 Newtown Walk.
Floor area stated for this source: 1,253 m².
Residential Development at Newtown, Kill, Co. Kildare- Phase 1 28 Housing Units
Floor area stated for this source: 3,068 m².
Source unit value with scope not stated: 28 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.