Site start

Site start — Dublin

Dublin

1 commencement notice · start date 08 Feb 2023 · planning reference given

Planning D18A/0545 · Planning application

View full project timeline

Commencement notices
1
Latest start date
08 Feb 2023
Latest notice
Scale not stated
Planning reference
D18A/0545
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Works to the site front boundary wall and entrance to provide an upgraded and relocated vehicular entrance with visibility splays. The work will include: alterations to sections of the existing stone wall to reduce its height; close up the existing site entry; construct new entry with piers, flank walls and recessed automatic gates; new, set- back post and panel fence and rearranged driveway; removal of four trees and planting of two new trees

Work stated for this notice Scale not stated for this notice.
Planning reference D18A/0545

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.