Site start
Housing site start — CLANE
CLANE, Kildare
1 commencement notice · start date 09 Jul 2020 · no planning reference given
Planning 2061 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 09 Jul 2020
- Latest notice
- 1 house
- Planning references
- None given
- Location
- CLANE, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2061 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- CLANE, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 2061. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
extensions and alterations to existing storey and a half type house to include (a) Single storey sitting room extension to front of existing house. (b) Single storey utility room and car port extension to rear of existing house. (c) Storey and a half living room and bedroom extension to side of existing house. (d) Modifications to front door opening, modified window openings to front gable, ground and first floor, omission of front dormer window, new velux rooflight to front of house, new bedroom window at first floor level, side gable, modified window opening to kitchen area, new window to dining area at ground floor level, side gable, modified patio door opening to include new window opening to toilet at ground floor level, internal modifications and all associated works. (e) Single storey domestic garage. (f) All associated site development works
Floor area stated for this source: 117 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.