Commencement notice group
Housing commencement notices — Headford
Headford, Galway
1 unique commencement event · latest notified commencement 05 Jan 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 05 Jan 2026
- Latest notice
- 56 houses
- Planning references supplied
- 21/2388
- Public location
- Headford, Galway
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 21/2388 Galway County Council · checked 2026-07-29T15:51:19+00:00
Planning 21/2388 — CONDITIONAL · Decision 2022-06-17 · Final grant 2022-07-25
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Major-project dossier · Wave 1 · G10
Reviewed planning, commencement and document evidence
Source-backed scopeHousing commencement notices — Headford
Planning scope and commencement-event scale are retained as separate evidence; this label is not expanded into unreviewed works.
- Commencement identities
- 1 retained separately
- Latest group date
- 05 Jan 2026 not assigned across events
- Maximum on one notice
- 56 units never summed
- Reviewed index
- 5 5 exact document links
Planning and appeal references
- Planning 21/2388 Open exact official record
Supplier screening cues
- Residential scale screening cueMaximum stated scale on one retained notice: 56 units.
- Built-area screening cueMaximum stated floor area on one retained notice: 5877.1 m².
- Civil, drainage and roads package screening cueReviewed official index contains Engineering and drainage.
- Architectural package screening cueReviewed official index contains Architecture drawings.
Every retained commencement event
- 05 Jan 2026 CN0137123GC 56 units on this event · 5877 m² on this event Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Galway County CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
Official document index highlights
Reviewed public index extract; this is not asserted to be the complete authority file.
- Architecture drawings 2346118 Plans, Sections, Elevations Open exact official document
- Architecture drawings 2346098 Sections Open exact official document
- Site layout 2346119 Site layout plan Open exact official document
- Site layout 2386370 Unsolicited Information (Site Layout) Open exact official document
- Engineering and drainage 2353143 Water Supply Plans Open exact official document
Source limitations and event boundary
Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.
- The public evidence source provides a project label, references, group-level maxima and a reviewed document extract; it does not provide a full permission description for this dossier.
- Planning and appeal event dates are unavailable in the reviewed public source and are not inferred.
- Organisation coverage is limited to the responsible planning authority and, where an appeal reference exists, An Coimisiún Pleanála; no supplier appointment is claimed.
- Reviewed public index extract; this is not asserted to be the complete authority file.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Headford, Galway
- County
- Galway
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Galway County Council planning record Application details, status and decision record for 21/2388. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 56 No. houses consisting of a) 20 No. 4-Bed semi-detached houses, b) 22 No. 3-Bed semi-detached houses, c) 8 No. 2 Storey Terrace houses and d) 6 No. 1 Storey terrace houses.
Floor area stated for this source: 5,877 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.