Site start

Housing site start — Burren

Burren, Clare

1 commencement notice · start date 01 Jan 2019 · planning reference given

Planning 161010 · Council file · external

Commencement notices
1
Latest start date
01 Jan 2019
Latest notice
133 m²
Planning reference
161010
Location
Burren, Clare

Location

Where the site is

Area
Burren, Clare
County
Clare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

to alter design of dwelling house and garage from those previously granted under Planning Ref No. P10/906 and P16/297 (Extension of Duration) together with ancillary site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 133 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 161010

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.