Site start

Building extension site start — Athboy

Athboy, Meath

1 commencement notice · start date 12 Feb 2025 · planning reference given

Planning 221676 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
12 Feb 2025
Latest notice
508 m²
Planning reference
221676
Location
Eighty Eight Acres, Fairgreen, Athboy, Meath

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Athboy, Meath
County
Meath

Addresses on the notices

  • Eighty Eight Acres, Fairgreen, Athboy, Meath
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Meath County Council planning record Application details, status and decision record for 221676. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

To construct 1. extension and renovation works to the existing test lane of the side (southwest) elevation, which will facilitate an LCV test lane (from 85.2 sqm to 263.5 sqm) (2) an extension to the front (northwest) elevatioin consisting of a new entrance porch (9sqm) (3) alterations to existing front (northwest) and side (northeast) elevation windows (4) installation of aluminium or similar cladding to the front (northwest) facade (5) alterations to the internal layout of the existing ground floor to consist of waiting area, receiption/office and WC (6) upgrade existing signage to the front (northwest) elevation (from 12.8sqm to 4.3sqm) and all associated site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 508 m².

Planning reference 221676

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.