Housing commencement notices — Finglas

Finglas, Dublin

1 unique commencement event · latest notified commencement 20 Sep 2024 · planning basis not stated

View full project timeline

Unique commencement events
1
Latest notified commencement
20 Sep 2024
Latest notice
260 m²
Planning references supplied
None stated
Public location
Finglas, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Finglas, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0119782DC BCMS owner-supplied export

for the demolition of existing attached single storey side garage structure to 36 Rathvilly Drive and construction of new 2 storey, 2 bedroomed house consisting of WC, storage combined living space/kitchen at ground floor and 2 bedrooms, WC and store at 1st floor and associated works between 36 and 36A Rathvilly Drive, subdivision of land for both dwellings. New single storey extension and double storey extension to the rear of 36 Rathvilly Drive and associated works. Modifications to existing entrance of original house to accommodate pedestrian entrances for each of the properties.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 260 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Builder stated: Rebuild Your Home LTD

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.