Commencement notice group

Housing commencement notices — Dublin

Dublin 16, Dublin

1 unique commencement event · latest notified commencement 01 Oct 2024 · planning reference supplied

View full project timeline

Unique commencement events
1
2 public source rows · 1 duplicate representation consolidated
Latest notified commencement
01 Oct 2024
Latest notice
114 m²
Planning references supplied
SD24B/0247
Public location
Dublin 16, Dublin

Verified project chain

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
2
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Completion certificates are shown only after the official planning, commencement, certificate and PDF evidence chain passes; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin 16, Dublin
County
Dublin

Notice location variants

  • ground floor level NBCO:CN0120149SD, CN0120149SD
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD24B/0247. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 1 duplicate source representation is consolidated under the canonical notice reference while every source remains visible beneath that event.

CN0120149SD 2 public source representations

1. Demolish existing garage to side of dwelling. 2. Demolish existing bay window to front elevation at ground floor level. 3. Construct new two storey extension to side with attic store & Home Office incorporating new dormer window to rear of existing and proposed roofs with rooflights to existing and proposed roofs to dwelling. 4. Construct new single storey extension to rear of dwelling. 5. Construct new bay window and front entrance door/screens to existing front elevation with tiled roof canopy over. 6. New smooth render finish with external insulation to existing & new elevations. 7. Alterations to existing window opes at first floor level to rear of existing house 8. All above with associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 114 m².

Planning reference SD24B/0247
Source representations
  • NBCO historical file · NBCO:CN0120149SD Notified commencement: 2024-10-01 Source checked: 2026-08-13T05:18:58Z Floor area stated in this source representation: 114 m² Open source record Open official source
  • BCMS open-data feed · CN0120149SD Notified commencement: 2024-10-01 Source checked: 2026-06-09T15:11:14Z Floor area stated in this source representation: 114 m² Open source record Open official source

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.