Site start
Building extension site start — Dublin
Dublin 2, Dublin
2 commencement notices · latest start date 02 Feb 2018 · planning references given
Planning 3538/16 and 3654/17
- Commencement notices
- 2
- Latest start date
- 02 Feb 2018
- Latest notice
- Scale not stated
- Planning references
- 3538/16 · 3654/17
- Location
- Dublin 2, Dublin
Location
Where the site is
- Area
- Dublin 2, Dublin
- County
- Dublin
Addresses on the notices
- underground carpark in basement
- basement level
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Connection to 1-4 WML project via new access at underground carpark in basement.1
The project consists of constructing an additional floor to the existing building along with the omission of existing vehicular access ramp to the basement of the Hanover Building from Hanover Street East, infilling the existing ground floor terrace area to the east, and associated internal amendments throughout including a link to the Hanover Building at basement level.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.