Commencement notice group

Housing commencement notices — Broadford

Broadford, Kildare

1 unique commencement event · latest notified commencement 06 Feb 2019 · planning basis not stated

Unique commencement events
1
Latest notified commencement
06 Feb 2019
Latest notice
1 house
Planning references supplied
None stated
Public location
Broadford, Kildare

Public source geography

Site location

Public site / locality
Broadford, Kildare
County
Kildare
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 18496. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0048011KE BCMS owner-supplied export

The restoration of an existing vernacular house, erection of a single storey extension to the rear (south- west) elevation of the existing vernacular house and the installation of a septic tank and percolation area to serve proposed restoration and extension to vernacular house and all associated siteworks and the relocation of existing septic tank and new percolation area to serve the existing adjoining house.

Work stated for this notice 1 house Explicit notice quantity stated by the source.

Floor area stated for this source: 260 m².

Builder stated: Branton Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.