Commencement notice group

Housing commencement notices — Glanmire

Glanmire, Cork

9 separate notices · latest notified commencement 31 Jan 2026 · planning reference supplied

Source notices
9
Latest notified commencement
31 Jan 2026
Latest notice
15 units
Planning references supplied
24/43051
Public location
Glanmire, Cork

Public source geography

Site location

Public site / locality
Glanmire, Cork
County
Cork

Public site labels seen across the notices

  • Cork, Cork
  • units 6 & 7 Building 1, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork
  • units 1 & 2 Building 1, Duneen, Ballincrossig, Glanmire, Cork
  • Units 12 & 13 Building 2, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork
  • Units 8 & 9 Building 2, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork
  • Duneen, Ballincrossig, Barnavara Road, Glanmire Cork
  • 2 additional public site labels
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Application details, the decision and any documents published by the authority are available in the official planning file.

  • Official planning file Application details, decision and available documents Cork City Council · reference 24/43051 Official council planning portal checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference24/43051

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0137652CY BCMS owner-supplied export

Construction of Units 3, 4, & 5 of building 1. Construction of 15 No. Townhouse units in 3No. Blocks and all associated ancilliary development works including pedestrian access, 1No. Pedestrian Crossing, Parking, Footpaths, Drainage etc.

15 units · 280 m² · stated on this notice

Planning reference 24/43051 Builder stated: DCN Developments Developer stated: DCN Developments
SN0013608CY BCMS open-data feed

Construction of Ground floor apartment with maisonette overhead at units 6 & 7 Building 1, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork

2 units · 149 m² · stated on this notice

Planning reference 24/43051
SN0013618CY BCMS open-data feed

Construction of ground floor apartment with maisonette overhead at units 1 & 2 Building 1, Duneen, Ballincrossig, Glanmire, Cork

2 units · 149 m² · stated on this notice

Planning reference 24/43051
SN0013574CY BCMS open-data feed

Construction of Ground floor apartment with maisonette overhead at Units 12 & 13 Building 2, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork

2 units · 149 m² · stated on this notice

Planning reference 24/43051
SN0013555CY BCMS open-data feed

Construction of Ground floor apartment with maisonette overhead at Units 8 & 9 Building 2, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork

2 units · 149 m² · stated on this notice

Planning reference 24/43051
CN0137405CY BCMS owner-supplied export

This notice is for units 10 & 11 of building 2. Construction of 15 no. townhouse units in 3 no. blocks and all associated ancilliary development works including pedestrian access, 1no. pedestrian crossing, parking, footpaths, drainage, and landscaping at Duneen, Ballincrossig, Barnavara Road, Glanmire Cork. This notice is for 3No. dwellings of the 15No. total.

15 homes · 187 m² · stated on this notice

Planning reference 24/43051 Builder stated: DCN Developments Developer stated: DCN Developments
CN0136827CY BCMS owner-supplied export

This notice is for units 16, 17, & 18 of building 3. Construction of 15 no. townhouse units in 3 no. blocks and all associated ancilliary development works including pedestrian access, 1no. pedestrian crossing, parking, footpaths, drainage, and landscaping at Duneen, Ballincrossig, Barnavara Road, Glanmire Cork. This notice is for 3No. dwellings of the 15No. total.

15 homes · 840 m² · stated on this notice

Planning reference 24/43051 Builder stated: DCN Developments Developer stated: DCN Developments
SN0013510CY BCMS open-data feed

Construction of ground floor apartment with maisonette overhead at Units 19 & 20, Building 3, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork."

2 units · 149 m² · stated on this notice

Planning reference 24/43051
SN0013509CY BCMS open-data feed

Construction of ground floor apartment with maisonette overhead at Units 14 & 15, Building 3, Duneen, Ballincrossig, Barnavara Road, Glanmire, Cork."

2 units · 149 m² · stated on this notice

Planning reference 24/43051

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.