Site start

Housing site start — Batterstown

Batterstown, Meath

1 commencement notice · start date 11 Aug 2020 · planning reference given

Planning RA/191797

View full project timeline

Commencement notices
1
Latest start date
11 Aug 2020
Latest notice
285 m²
Planning reference
RA/191797
Location
Batterstown, Meath

Location

Where the site is

Area
Batterstown, Meath
County
Meath
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of a single storey style dwelling with detached domestic garage, a domestic waste treatment system and percolation area, new site entrance and all associated site works as originally granted planning permission under Planning Reg. Ref RA171395 and revised under Planning Reg. Ref RA/191797.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 285 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference RA/191797

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.