Site start

Housing site start — Leixlip

Leixlip, Kildare

1 commencement notice · start date 10 Aug 2020 · planning reference given

Planning 191410 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
10 Aug 2020
Latest notice
Scale not stated
Planning reference
191410
Location
Leixlip, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Leixlip, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 191410. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Permission to remove the existing tiles roof over existing study/utility side structure & construct new first floor extension over with a tiled roof to match existing new two storey extension with a tiled roof to the side of the existing dwelling, new front porch with a tiled roof, internal alterations, external alterations, external finishes to match existing & associated site works at 8 Glen Easton Rise, Leixlip, Co. Kildare. In accordance with the plans submitted with the application

Work stated for this notice Scale not stated for this notice.
Planning reference 191410

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.