Site start
Building extension site start — Rathgar
Rathgar, Dublin
1 commencement notice · start date 13 Jul 2016 · planning reference given
Planning 3171/15
- Commencement notices
- 1
- Latest start date
- 13 Jul 2016
- Latest notice
- Scale not stated
- Planning reference
- 3171/15
- Location
- Rathgar, Dublin
Location
Where the site is
- Area
- Rathgar, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the following work to this “protected structure” in 3 locations: 1. The construction of a new single story toilet block extension containing 4 toilet cubicles with a lobby and a new door into two class rooms on the rear of the existing school with the removal and relocating of boiler facility. Repairs and maintenance of storage shed for use as a boiler room. 2. Maintenance and repair of the existing toilet block together with a new universal WC cubical in the boys and girl’s toilets, the installation of a unisex handicapped toilet and new door opening in an existing window opening. Replace conservatory polycarbonate roof in solid roof with glass edge, set back entrance/exit door. 3. The removal of a stud partition and toilet from the staff area with related repairs.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.