Site start

Building extension site start — Maynooth

Maynooth, Kildare

1 commencement notice · start date 04 Aug 2026 · planning reference given

Planning 2660389 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
04 Aug 2026
Latest notice
74 m²
Planning reference
26/60389
Location
Maynooth, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Maynooth, Kildare
County
Kildare

Addresses on the notices

  • ground floor to the front including canopy
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 26/60389. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will consist of revisions to previously approved Grant of Permission, Reg. Ref. 2460163 as follows : • Demolition of single storey shed to rear; • Change of size, shape and fenestration to approved single storey extension to rear; • Omission of approved front single storey porch extension and addition of single storey extension at ground floor to the front including canopy; • Small increase to depth and change of fenestration to approved first floor extension to rear; • Reduction / reconfiguration of fenestration within approved attic dormer to rear; • Omission / alterations to windows to side / gable elevation at all levels; • All associated internal alterations, drainage, site and ancillary works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 74 m².

Planning reference 26/60389 Developer stated: Green leaf Carpentry and Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.