Site start
Building extension site start — Bray
Bray, Wicklow
1 commencement notice · start date 30 Sep 2019 · planning reference given
Planning 19/146 · Council file · external
- Commencement notices
- 1
- Latest start date
- 30 Sep 2019
- Latest notice
- Scale not stated
- Planning reference
- 19/146
- Location
- Bray, Wicklow
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 19/146 Wicklow County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Bray, Wicklow
- County
- Wicklow
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wicklow County Council planning record Application details, status and decision record for 19/146. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of the existing pitched roof over the the existing side extension and new construction of first floor two bedrooms total area of 18sqm over the existing side extension with new pitched roof over, with the addition of two new rooflights one to the front and one to the rear of the new pitched roof and four new numbers of roof lights, two to the front and two to the rear of the main existing pitched roof, also the construction of 3.5sm storage space to the rear of the existing ground floor extension all associated with site works at 1 Ardmore Court Bray Co. Wicklow.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.