Site start
Housing site start — Dublin
Dublin 7, Dublin
2 commencement notices · latest start date 04 Dec 2019 · planning reference given
Planning 2965/17
- Commencement notices
- 2
- Latest start date
- 04 Dec 2019
- Latest notice
- 20 m²
- Planning reference
- 2965/17
- Location
- Dublin 7, Dublin
Location
Where the site is
- Area
- Dublin 7, Dublin
- County
- Dublin
Addresses on the notices
- 1st floor level and 10 no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a Standalone Plant Building on the grounds of Chester House
Floor area stated for this source: 20 m².
The construction of an extension to the rear (south) of the Dublin Simon Community's existing supported housing facility. The proposed development includes the removal of an existing external fire escape stairs and ramps to the rear of the existing building and the construction of a three-storey extension to provide the following accommodation: 20 no. new ensuite bedrooms for residents (10 no. at 1st floor level and 10 no.at 2nd floor level), communal dining room with associated kitchen, staff facilities and toilets at ground floor level, including 4 no. rooflights above ground floor dining area comprising a total extension floor area (over three levels) of 868 m2.
Floor area stated for this source: 598 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.