Commencement notice group
Housing commencement notices — Dublin
Dublin 4, Dublin
1 unique commencement event · latest notified commencement 03 Sep 2025 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 03 Sep 2025
- Latest notice
- 205 m²
- Planning references supplied
- None stated
- Public location
- Dublin 4, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 4, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Construction of a ground floor flat roof extension to the rear, two-storey extension at first floor level to the side of the existing two storey semi- detached house complete with a new hipped roof which is an extension of the existing hipped roof, a new dormer rooflight along the rear of the main roof and a new brick treatment to the ground floor level of the front elevation of the side extension.
Floor area stated for this source: 205 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.