Site start
Housing site start — Naas
Naas, Kildare
1 commencement notice · start date 14 May 2018 · planning reference given
Planning 14848 · Council file · external
- Commencement notices
- 1
- Latest start date
- 14 May 2018
- Latest notice
- 264 m²
- Planning reference
- 14848
- Location
- Naas, Kildare
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
construction of a two storey domestic dwelling, domestic garage with domestic storage over at 1st floor level, the installations of an Oakstown(BAF) waste water treatment system, modification of existing entrance and associated site works
Floor area stated for this source: 264 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.