Site start

Site start — Dublin

Dublin

1 commencement notice · start date 30 May 2022 · planning reference given

Planning D21A/1103 · Planning application

View full project timeline

Commencement notices
1
Latest start date
30 May 2022
Latest notice
1 house
Planning reference
D21A/1103
Location
Dublin

Commencement and completion records

Planning, start and completion

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Planning applications
Links to official records
0
Links between applications
Repeat copies merged
Completion certificates

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Refurbishment and Alteration Works Works to include; (A) Front façade: Repair, restoration and re painting of decorative features to all front windows surrounds, bands, entrance door, porch and parapet: (B) Front garden: The replacement of the macadam with gravel and an increase in the peripheral planted area. (C) At second floor level in the return: the increase in the footprint of the existing lavatory to include a shower and the replacement of the existing attic trapdoor with an enlarged unit. (D) At first floor level in the main house: the formation of an ensuite bathroom in part of the rear bedroom with a door in the dividing partition wall into the front bedroom. A suspended ceiling to be fitted, in the ensuite, with a rooflight for natural light and ventilation. (E) At entrance floor level, in the main house: removal of the existing shower room in the rear reception room to create a kitchen/dining area with an opening in the dividing partition to the front living room area. (F) At entrance floor level, in the return, in the proposed family room the replacement of the existing external door and steps with an enlarged opening for a door and screen and balcony and steps into the rear garden and the insertion of a cloakroom into part of the room accessed from a new door in the partition to the return landing, (G) )At lower ground floor level in the main house: the increase in the footprint of the existing lavatory to include a shower room and the replacement of the gate under the entrance steps with a door. (H) Rear Façade: Erection of SVP, beside existing rwp, to service the proposed appliances in the first floor ensuite, and in the entrance floor kitchen, and the erection of solar panels on the rear slated roof; (I) Upper Level Rear Garden: Addition of horizontal rail to existing railings. (J)All levels internally: Replacement of the existing electrical and plumbing installations and contingent alteration to the drainage system. (K)Roof Space; Insulate (L) Gene

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 320 m².

Planning reference D21A/1103

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.