Site start
Housing site start — Terenure
Dublin 6W, Dublin
2 commencement notices · latest start date 12 Sep 2016 · planning reference given
Planning 2794/15
- Commencement notices
- 2
- Latest start date
- 12 Sep 2016
- Latest notice
- Scale not stated
- Planning reference
- 2794/15
- Location
- Dublin 6W, Dublin
Location
Where the site is
- Area
- Dublin 6W, Dublin
- County
- Dublin
Addresses on the notices
- Terenure, Dublin
- this time and will follow in 2016
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a 2-storey house and studio and all ancillary works to the rear of 330 & 332 Kimmage Road Lower.
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
This commencement notice relates to the demolition of an existing 512 sq.m joinery workshop on the site ONLY as outlined in the planning permission 2794/15. The planning permission describes a broader scope of work, including the construction of 2-storey detached house and home office, which does not form part of this work. The works will be done in two phases. The commencement notice for the construction of the house and office is NOT submitted at this time and will follow in 2016. The demolition is carried out now due concerns with regard to structural stability and trespassing.
Overall development total stated in source: 1 unit.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.